Maps & Photos - Dock Replacement

The Treasure Island community dock was approved for replacement at the 2008 annual membership meeting. With all of the permits and approvals finally in place, Lakeshore Construction completed the work in October 2010 (see photos). The first few photos are of the old dock, including one of it being towed away.

The new float retains the same dimensions, 16 feet x 68 feet, as the old float and is constructed with pressure-treated wood certified for marine use. To meet requirements for light penetration, an 8-foot-wide, molded-fiberglass, non-skid grating runs down the center of the float. The new aluminum gangway ramp is 4 feet wide and 60 feet long. The floor has a molded-fiberglass, non-skid grating.

Photos by Jackie Longmire. The project was managed by Dock Commissioner Larry Grumme.