Maps & Photos - Bridge Work
Photos sets of maintenance, repairs, and inspections
of the bridge arranged from newest photos to oldest.
October 2009 Bridge Repairs by Quigg Brothers
Construction. The repairs involve 11 percent of the pilings, 38
percent of the caps, and 5.5 percent of the braces. Photos by Gary
Longmire.
Sargent Engineers inspecting the bridge timber caps
and tops of the timber piles (April 2006). The under-bridge inspection
vehicle, called an articulated boom truck, is rare---there are ony a
few like it in the whole country! Photos by Kim Cimmery.
Many thanks to
Taylor Shellfish Farms for scraping
the barnacles and mussels off the bridge understructure in preparation
for its July 2005 inspection. See below for before and after photos of
the pilings and the Taylor crew at work.
Replacement of the pile cap over bent #6, October
2003. Photos by Dave Dickinson.