Switching Over to the Detour
<
Cutting and Capping the Piles | Building the New Bridge
| Pile Vacuuming Job >
On Friday, December 16th, the bridge was closed
from 8:30 am to 12:00 noon to switch the traffic over to the detour. The detour
will remain until the south half (new driving lane) of the new bridge is
complete, which is scheduled for February 2012. The Grapeview Fire Department #3 performed
a drive-through to make sure Emergency vehicles could make it through the
detour. See a short time-lapse of the fire truck
navigating the detour here.

Detour open to traffic

Grapeview Fire Truck testing the new detour
<