On Monday, February 6th,
the last of the pile caps for Piers 14, 15, and 16 were poured. The
bridge was closed at 8:30 am and the pump truck was in position at
8:45 am. The bridge was opened back up to traffic by 3:45 pm.

Pump truck waiting for the next load of concrete

American Construction crew pouring the pile cap
of Pier 16

Pump truck and concrete truck working off the old
bridge to pour Pier 16 pile cap
<